Dear all,
I was wondering if it is possible to add planting dates in-between the ones that i have already input.
i.e. i have 500 different planting levels and i want to add 2 more between the levels 38 and 39 is it possible?
When i hit add the next level is added on the bottom if i put the two levels i want there instead between 38 and 39 would this affect the result?
Thank you